Top 2 Bottom Pro Cleaners

Solutions / Specialty & Project Services

Post-construction. Emergency. Event & specialty work.

Rapid-response resilience teams, post-construction handover squads, and build-live-strike event logistics. Accredited, insured, and mobilised across 8 regions — 24/7/365.

24 / 7 · 365 RRT

Incident response.
90 minutes on-site.

Incident commander triages in under 3 minutes. Rapid response team mobilises within 12. On-site ETA averaged across P1 callouts — 87 minutes. Every incident closed with root-cause, photographs & client sign-off.

Avg P1 ETA
0 min
P1 · 2025 YTD
First Close-Out
92%
Within 24 hours
RRT Squads
14
8 regions · standby
Accreditations
11
ISO · BS · CHAS
Watch Floor · Live Routing
Severity Routing Matrix · 2025
LIVE · London · 21:42
P1
LIFE SAFETY · CRITICAL
Team: RRT Bronze
≤ 90 min

Fire / flood / power loss / lift entrapment / structural concern. Incident commander on-site + client comms every 30 min.

P2
INCIDENT · URGENT
Team: RRT Silver
≤ 3 hours

Water ingress, access failure, plant trip, HVAC down, security breach. Watch commander owns root cause + close-out.

P3
EVENT · RESPONSE
Team: Event Task
≤ 8 hours

Event-day snags, build issues, weather damage, guest-facing defects. Strike-team in branded vehicles, site-briefed & badged.

P4
PROACTIVE · AD-HOC
Team: Squad Pool
≤ 48 hours

Same-day/next-day specialist works: high-level access, rope, post-event strip, photography support, resident-facing response.

Calls 24hr
118
P1 Queue
0
P2 Open
6
Regions
8
Post-Construction Handover

From builders-clean
to tenant-ready. Five phases.

Aligned to RIBA Stage 6, we plug in at practical completion and run the final mile — builders 1 + sparkle 2 + snag support + handover pack + 12 months aftercare. One handover team, fully badged.

01
Pre-handover

Rough-in & Builders Clean 1

After first-fix mechanical & electrical. Remove all arisings, cement dust, plaster, packaging & site debris from the envelope.

Site wasteDust extractEnvelope vac
02
Mid-project

Sparkle Clean 2

Post-decoration. Deep clean all finishes: carpet, tile, timber, paint, glazing, sanitaryware & kitchen furniture.

Glass finishDetail maskAppliance prep
03
Days before

Snag Support + Final

Handover-team support: décor touch-ups, sealant refresh, hardware bagging, label & plaque placement, serial photography.

Décor touch-upSealant refreshPhoto log
04
Handover

Client / Tenant Sign-off

200-point sign-off matrix aligned to RIBA Stage 6. Matterport scan + digital photo-of-every-room handover pack.

200pt matrixMatterport 3DHandover PDF
05
12 months

Aftercare & Defects

12-month defects-liability support. Attend contractor meetings, run defect lists, close out with sign-off per room.

Defect logMonthly roundsContractor liason
Event · Build · Live · Strike

Build. Run. Strike.
Same team. Every show.

Conferences, product launches, film premières, royal parks, sporting finals, brand pop-ups. Accredited crew, manifest-driven logistics, and a dedicated event commander from load-in through landlord make-good.

Request event quote
01 · Load-In
Day −7 to Day −1

Build & Install

Site access plan, logistics, fencing, barrier, stage, lighting, power, flooring, branding, welfare & waste management.

Crew
42 staff
Trucks
18 lorries
Access
3 routes
Accredited crew · DBS · CSCS
LIVE PHASE
02 · Live
Doors open → Close

Event Ops

On-site command, guest-facing response, front-of-house cleaners, waste-as-you-go, lost property, incident & weather plan.

On-site
112 crew
Response
< 4 min
NPS
+78
Guest-ready response · < 4 min
03 · Strike
Day +0 to Day +2

Break & Make-Good

Strike, manifest, branded material reconciliation, reinstatement, deep clean, dilapidation photos & handover to landlord.

Waste
98% diverted
Reinstate
24 hr
Photos
400+
Landlord sign-off pack
Resilience & Accreditation

Certified. Audited.
Crisis command-ready.

Full annual audits against ISO, BS industry and HSE standards. Every team rostered with a gold-command qualified incident commander — 24/7 watch-floor briefed on your site.

Events Delivered · 2025
0
Wembley · Excel · Hyde Park · O2100% sign-off
Post-Construction Handovers
0
11 developers · 8 housebuilders≤ 1.8% snag
ISO 41001
IFM · UKAS
Passed · No NCs2025
BS 9997
Fire Management
Passed · No NCs2025
BS 25999
BCM · Resilience
Passed · No NCs2025
ISO 9001
Quality · UKAS
Passed · No NCs2025
CHAS Premium
SSIP · Common
Passed · No NCs2025
CSCS · DBS
All site staff
Passed · No NCs2025
ISO 27001
Information Sec.
Passed · No NCs2025
NEBOSH
Incident · H&S
Passed · No NCs2025
Constructionline
Gold · SSIP
Passed · No NCs2025
RRT / Project / Event

One specialist team.
Emergency, project, event.
All mobilised today.

Send us one incident, one practical completion, or one live event brief. We'll come back with severity routing, a 5-phase handover plan, or a build-live-strike rota — in under 4 working hours.

P1 ETA
0 min
On-site avg
Events
0
2025 delivered
Projects
0
PC → Handover
Accreditations
0%
Audit pass rate